Building log: coaming
Written by Magnus   
tisdag, 19 september 2006

The stems will have to wait a bit: I decided it is time for the coaming. I start out with three ash battens, one for the coaming itself, and two for the coaming lip. These are steam-bent around a form, and when dry, laminated with epoxy.

Coaming

Each batten is joined with a  long glue scarf placed at the back edge:

Lask / scarf  

 

My steaming setup: I steamed ribs and coaming for my first SOF by boiling them in a big pan. It worked, but took a long time because I had to boil and bend each end of the ribs separately... By accident I found a cheapo wallpaper steamer in a shop, and by adding a long polypropene pipe, a pipe fitting, and a short piece of hose, I had the perfect steaming device:

Steamer steamersteamer

Total build time: 6 hours


Only registered users can write comments.
Please login or register.

Powered by AkoComment 2.0!

 
< Prev   Next >